A
dozer benches the hillside, while the BE drill rig drills
blast holes
.
Photo: David
hopper
Though
the spade wasn't doing much that morning, there was plenty of
activity in the pit. A D10 dozer was benching the hillside and
the BE drill was drilling blast holes ahead of the spade. Watching
these machines, gave a good indication of the direction that the
spade would be heading..
|